10/26/97
Paradox panelists (l-r): Michael Gosney, Paolo Soleri, Jack Sarfatti, Charles Ostman, Coco Conn, Nathan Koren, David Traub, Mark Pesce and Ron Anastasia.

10/26a/97
View from West Housing balcony.

10/24/97
Overflow audience in the sun outside the Colly Soleri Music Center where the Paradox panelists are speaking.

10/23/97
Laying steel for slab #7 in the Heat Duct Tunnel.

10/22/97
Cody, Bert, Karen and Teri in a surreal moment.

10/21/97
Cody and Shelly.

10/20/97
The new tool shed goes up.

10/17/97
Pumping another twelve cubic yards of concrete for three wall sections.

10/16/97
Slab for a new tool shed next to Unit #5 in the East Crescent.

10/15/97
Eleanor, Jonathan and Monica.

10/14/97
(In background) Preparing quickbeam supports for Unit #7 Heat Tunnel roof slab.

10/13/97
Crew levels an area to pour a slab for a new tool shed.

10/10/97
Cody, Christina and Mike.

10/09/97
James prepares knock-out forms for the Heat Tunnel.

10/08/97
Nadia talks to the new workshop in the Library about plans for the East Crescent Complex.

10/07/97
Nadia and Tristan visit construction formwork next to the Drafting room.

10/06/97
Dave consulting with Christina and Mike.

09/30/97
Group photo of the Heat Duct Tunnel crew after a morning pour. L-r: James, Teri, Karen, Brent, Cody (hidden), Jesse, Jonas, Mike, Bert, Paul, Christina and Dave (kneeling).

09/29/97
Final preparation for an eight cubic yard slab pour.

09/26/97
View east in the aftermath of hurricane Nora. About two feet of water added to Lake Leak.

09/25/97
Loading truck for a recycling run into Phoenix. Hurricane Nora in the background.

09/25B/97
Objects found during recycling: Still Life with Centipede.

09/24/97
Annie tailing in a bronze pour in the Foundry.

09/23/97
East Tunnel crew setting wall forms next to the S.O.D. Unit.

09/22/97
Christina and Mike laying steel for a floor slab.

09/19/97
Karen carrying formwork.

09/18/97
Preparing formwork for a roof slab on the Heat Duct Tunnel.

09/17/97
Dave explains how to tie rebar in a tight form.

09/16/97
Placing 4x4 as formwork in the Heat Duct Tunnel.

09/15/97
Heat Tunnel crew prepares for another day.

09/12/97
Planning group discusses East Crescent details.

09/11/97
Amanda (...can't you tell that's her?!) paddles out onto Lake Leak.

09/10/97
Relaxing at the Swimming Pool after work.

09/09/97
New workshop continues work on the handicap access ramp to the Greenhouse rooms.

09/03/97
Tony poses with his cow: an art insatllation in the Minds Garden, overlooking the Aqua Fria river canyon.

09/02/97
Peach preserves party in the Cafe.

09/01/97
Residents and guests gather on top of the Vaults to watch the sunset in front of them.

08/29/97
Pumping concrete: four wall sections in the East Crescent Heat Duct Tunnel totalling 20 cubic yards.

08/28/97
Push to finish wall forms for tomorrow's pour.

08/27/97
Group Motion participants morning warm-up in the Music Center.

08/26/97
Rainy day looking east from the Sky Suite.

08/25b/97
Washing the silt from the plaster ceiling panel.

08/25/97
Transferring a 400 lb. plaster ceiling panel onto a transport bed.

08/19/97
Heat Tunnel crew preparing for a 20 Cubic yard pour next week.

08/18/97
Tony installing awnings on the third floor of the East Crescent.

08/15/97
Forms going up.

08/14/97
Heat Tunnel crew prepares to set wall forms.

08/13/97
"Chef" Soleri struttin' his stuff in front of a Phoenix cameraman.

08/12/97
Ken and Lori examint the results of previous night's glaze firing.

08/11/97
Hauling plywood to set forms for more walls in the Heat Duct Tunnel.

08/08/97
Casting a Hydrocal panel for the Soleri wing of the Tucson Cancer Center.

08/07/97
New workshop helps prepare a handicap ramp to the Greenhouse rooms.

08/06/97
Final sections of floor slab in the Heat Duct Tunnel.

08/05/97
Silt-casting team prepares molds for large plaster panels for the Tucson Cancer Chapel.

08/04/97
Framing in a light scoop room.

08/01/97
Steel framing in unit #4.

07/31/97
Tying rebar for the last floor slab in the HDT.

07/30/97
Heat Duct Tunnel footing connects with the SOD Unit! A landmark pour for the year!

07/29/97
Forms for more walls in the Heat Tunnel.

07/28/97
Final painting in unit #5.

07/27/97
Steel for the last leg of the Tunnel footings into the SOD unit.

07/26/97
Italian night in the Vaults.

07/25/97
Rear wall formwork in the Heat Duct Tunnel.

07/24/97
Recreational night pour in the bronze foundry.

07/24a/97
Young Tristan getting his feet bronzed.

07/24b/97
Annie preparing to cast a (dead) rattlesnake as a necklace.

07/24c/97
Breakout of the molds; examining the results.

07/24d/97
Eriko showing her casting.

07/23/97
Getting close to the SOD Unit!

07/22/97
Tom uses the crane for exercise.

07/21/97
(...Shhhh...work continues on the secret Underground City Coffeehouse...)

07/18/97
Patio work in the East Crescent.

07/17/97
Brent repairs the lifting arm of the backhoe.

07/16/97
View of the Silt-casting area.

07/15/97
Placing steel for another Heat Duct Tunnel floor slab.

07/14/97
Masonry work on a patio behind the East Crescent, 3rd floor.

07/11/97
Additional block work near the batch plant.

07/10/97
Frugal Soup in the Vaults: a monthly tradition at Arcosanti.

07/09/97
Making pavers with excess concrete.

07/08/97
Heat Duct Tunnel floor slab under unit #8.

07/07/97
Preparing a pour in the Heat Duct Tunnel.

07/03/97
Tony gets a new table for the Metal Shop...manhandles 1/2" steel plate.

06/30/97
Work on the Heat Duct Tunnel approaches the S.O.D. (Soleri/Office/Drafting) unit.

06/27/97
Gwen and Mark installing a circular window in one of the East Crescent light scoop rooms.

06/26/97
Under the Big Top in the Heat Duct Tunnel.

06/25/97
Chess on a chalked board in Vicolo Primo.

06/20/97
Susie painting railings in ine East Crescent.

06/19/97
Soleri and workshop under a tree in the lake area.

06/18/97
Soleri explaining future plans for "Lake Leak".

06/17/97
Mark and Mike installing radiant in-floor heating in unit 5 of the East Crescent.

06/16/97
Nat fabricating a grate for an East Crescent heat tunnel vent.

06/14/97
Voxfire in concert! Three exquisite sopranos (l-r: Samela Aird Beasom, Susan Judy and Christen Herman) singing music of the Renaissance; Nina Treadwell, lutist, accompaniment.

06/14b/97
Voxfire: morning rehearsal.

06/13/97
Land scraper redistributing clay, reshaping Lake Leak.

06/12/97
Five more cubic yards of footings!

06/11/97
Tying steel for more footings in the East Crescent.

06/09/97
An old parachute provides shade in the Heat Duct area.

06/06/97
Which one is Benton?

06/05/97
Authentic petroglyph on the rocks overlooking the swimming pool.

06/04/97
Walls for a Lightscoop!

06/03/97
Group shot of the new workshop in front of the peace toilet.

06/02/97
Preparing another set of walls for a light scoop.

05/30/97
White collar jackhammering...Cliff from the Gallery lends a hand.

05/29/97
More excavation in the Heat Duct Tunnel.

05/28/97
Drywall continues in EC unit #4.

05/27/97
Forming for the Light Scoop at unit #8 in the East Crescent.

05/26/97
The newest member of the community: Tristan Jean Paul Robert Tollas, born in the Foundry Apse on April 5, 1997, 8 lb. 7 oz.

05/23/97
The original model of Arcosanti in the Student Apse at Cosanti.

05/22/97
Randall Schultz gives a lecture/demonstration in the Silt/Clay area.

05/21/97
Transit mixer crew takes a break while waiting for the concrete to be placed.

05/20c/97
Ocean arcology "Sun Dial".

05/20b/97
Ocean arcology "Sun Dial".

05/20/97
Representatives from the Smithsonian Institute view models and drawings. The model is of an ocean (ship) arcology--rear view.

05/19/97
A beautiful day to be working.

05/16/97
Brent & Siempre in the woodshop.

05/15/97
Exterior of units #4 & 5 nearing completion.

05/14/97
Continuing saga of the Heat Duct Tunnel.

05/13/97
Heavy pneumatic jack-hammering of rock in the area under units 8-9-10 of the East Crescent Heat Duct Tunnel.

05/12/97
Tracy and Christine forming up another wall.

05/09/97
Moving sheetrock to the second floor of Unit 5.

05/08/97
Stripping forms.

05/07/97
Eriko carving ceramic bells.

05/06/97
Another wall goes up for Unit #7 Heat Duct Tunnel.

05/05/97
Ed keeps an eye on bell production in the Ceramics Apse.

05/02/97
Paul pumping gas into the backhoe.

05/01/97
Bronze pour at the Cosanti foundry.

04/30/97
Patio renovation at the base of the Bell Tower, Crafts III.

04/29/97
Stucco crew moves to the north side of Unit 4, upper level.

04/28/97
Trowelling stucco onto one of the light scoops in the East Crescent.

04/25/97
Pouring the Light Scoop footings.

04/24/97
Pouring the Unit #7 Heat Tunnel floor slab.

04/23/97
Recycling Slab crew takes a break and poses for the camera.

04/22/97
Preparing the 3rd floor units 4 & 5 for exterior finish.

04/21/97
Preparing for the Heat Tunnel floor slab at Unit 7 of the East Crescent Complex.

04/18/97
Two man roller hockey in the Vaults.

04/17/97
Pouring footings for a light scoop at the Heat Duct Tunnel.

04/16/97
Crew on Rebar Hill.

04/15/97
Exterior insulation on the 3rd floor East Crescent.

04/14/97
Pouring a small utility slab near the batch plant.

04/11/97
Recycling Slab almost ready for use.

04/10/97
Ceiling drywall nearing completion in Unit 4 of the East Crescent Complex.

04/09/97
Touching up around the Recycling Slab.

04/08/97
Stripping forms off the slab.

04/07/97
Another Heat Duct Tunnel slab!

04/04/97
Unit 4 ceiling crew competes with Unit 5.

04/03/97
Unit 5 ceiling crew competes with Unit 4.

04/02/97
Interior framing on the third floor.

04/01/97
April Fools Day?!!.

03/31/97
Continuing work on the heat duct tunnel. Excavation at Units 7 & 8.

03/28/97
Late afternoon in the town park.

03/27/97
More footings under Unit 6.

03/26/97
Pouring the next footings for the Heat Duct Tunnel.

03/25/97
Paul and Shirley, the first retirees at Arcosanti.

03/24/97
Footing formwork for the Unit 6 of the East Crescent.

03/21/97
Pouring the Heat Duct Tunnel Slab!!!.

03/20/97
Landscaping in front of the office.

03/19/97
Interior work on the third floor of the Crescent.

03/18/97
Side view of East Crescent construction.

03/17/97
Inside Phase III, Unit IV construction area.

03/14/97
Natalia and Martha building on the third floor of East Crescent.

03/13/97
Rebar work for the heat duct tunnel slab.

03/12/97
Shoring for the heat duct tunnel ceiling slab.

03/11/97
Monkeybars for adults.

03/10/97
Surveying the heat duct tunnel.

03/07/97
Aaron preparing the soil in front of East Housing.

03/05/97
Seminar with Paolo Soleri.

03/04/97
Bruce practicing his alphabet on some left-over concrete.

03/03/97
Finishing the floor slab in the new recycling area.

02/28/97
Interior studding in Unit 4 of the East Crescent Complex.

02/27/97
Snowball fight in the Music Center.

02/26/97
Recycling Slab crew group shot.

02/25/97
Backfilling the Recycling Slab wall.

02/24/97
Begin excavation of the remainder of the Heat Duct Tunnel.

02/20/97
Furring the ceiling in East Crescent Unit 4.

02/19/97
Block wall at the Recycling Slab.

02/18/97
Heat Duct Tunnel floor slab 8 yard pour.

02/17/97
Chris & Lee on Rebar Hill.

02/14/97
Cosanti Foundation Board of Trustees meeting in the Music Center.

02/13/97
Jack-hammering for the Heat Tunnel floor slab.

02/12/97
Windows going into East Crescent Units 4 & 5.

02/11/97
Pouring another wall section of the Heat Duct Tunnel.

02/10/97
Preparing for tomorrow's 7 yard pour in the Heat Duct Tunnel.

02/07/97
Plumbing repairs behind West Housing.

02/06/97
The photographer misses the the action.

02/05/97
After work on the Recycling Slab footings.

02/04/97
Building a wall for the Heat Duct Tunnel.

02/03/97
East Crescent unit 4&5 roof with sheathing and asphalt paper.

01/30/97
Repainting the Cube City chessboard during Camp synergy.

01/29/97
Foundation excavation for the recycling slab.

01/28/97
Looking onto Phase III construction from the third-floor.

01/27/97
Installing a small door inside a large one on West Housing.

01/24/97
I know it's art but what is it?

01/23/97
Chipping wood in Camp, the joys of...

01/22/97
Iron forging begins at the workshop.

01/21/97
Arcosanti/Penland ironworkers group shot.

01/20/97
Finishing touches being put on the Arcosanti & Penland gas forge.

01/17/97
A visitor makes a ceiling tile for the proposed ArcoMedia building.

01/16/97
Preparing a kiln for a glaze firing.

01/15/97
Howie can't get enough of the East Crescent roof.

01/14/97
View of the Agua Fria River canyon from the north side of the mesa.

01/13/97
It gets cold and rainy here, too.

01/10/97
People-to-People International (Korean-American exchange student) tour group inside the Vaults.

01/09/97
View east from the Crafts III stair tower.

01/08/97
Craig making a gas forge for upcoming Penland crafts workshop.

01/07/97
Jay and Percival enjoy their work.

01/06/97
High-level discussion in the Ceramics Apse.

01/03/97
After hours with the good folks at d'ArcoMart.

01/02/97
Slow-going on the East Crescent.

01/01/97
Another boring sunset.

12/31/96
Foundry pouring bronze bells at 2500 degrees F.

12/30/96
The Bakery.

12/27/96
Wall sheathing progressing.

12/26/96
Typical sunrise.

12/25/96
Christmas day from Camp.

12/24/96
Interior walls being sheathed.

12/23/96
Planning meeting with Paolo.

12/20/96
Plywood for interior walls being hoisted.

12/19/96
Scaffolding removed from front of Crescent units.

12/18/96
Rear view of Units 3 & 4 showing completed roof framing.

12/17/96
Progress of Steel roof framing.

12/16/96
Removing formwork of 4th Unit kneewall.

12/13/96
Forming the walls for the Heat Duct Tunnel.

12/12/96
Hoisting the center beam for the roofing of the third floor E.C.

12/11/96
Extending the Heat Duct Tunnel Around the Perimeter of the East Crescent.

12/10/96
Hoisting a Roof Beam.

12/9/96
Planter on 3rd Floor of East Crescent Complex.

12/6/96
Final concrete pour of Phase III East Crescent Complex.

12/5/96
Preparing knee walls for third floor balcony.
More Recent Pictures!