East house pan

East Housing:
2,300 sq. ft., 2 Stories
Housing for 4 Residents
Status: Completed

West Housing:
2,300 sq. ft., 2 Stories
Housing for 4 Residents
Status: Completed
East Housing borders the Vaults to the west, the East Crescent to the north, and the Music Center to the east
.

interior
Stairs leading up to the upper bedroom.
interior
Silt Cast ceiling design reflects the fire from the fireplace below.
interior
The Fireplace room.
East & West Housing
Begun in 1972 and completed in 1974, East Housing can provide housing for up to six people. The construction process was a combination of poured-in-place concrete and precast panels. The vaulted ceilings are decorated with large silt cast designs and the bathroom floors done with ceramic tile murals made on site. The large patio on the south can be enclosed by the 12 foot swinging glass doors, taking advantage of the Greenhouse Effect.