In the East Crescent complex, the workshop and construction crew prepare the second floor of Unit 7 for a hydronic floor heating system.
[Photo: Mirelle Packer & Text: sa]
The heating coils have to be carefully secured to the metal mesh, which sits on a layer of styrofoam.
[Photo: Mirelle Packer & Text: sa]
The system is in place.
[Photo & Text: sa]
Planned wall partitions and built-in cabinet spaces are marked.
[Photo: Haley Byrd & Text: sa]
The completed hydronic system connects into a control unit on the wall. Next step will be to pour a layer of gypcrete to cover the system.
[Photo: Haley Byrd & Text: sa]

