We reported on 12/27 on installation of the new shade structure in the Foundry apse
[Photo & text: sa]
The second half of the winged frame is in place. The actual shade can be attached to the frame when needed. It's still raining.
[Photo & text: sa]
TrackBacks[0]
Posted by sue on January 3, 2005 4:27:05 PM MST
TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1104794825000

