This continues the report of a new storage shed for the Ceramics Studio from 9/25/06. [from upper left] Expanded metal lath was applied to the outer walls, before they were covered with another coat of concrete. Construction staff Brendon Maloney and Mario Nuzzulese prepare a special concrete mix. Angus Gluck [with hat] headed this project.
The coating was moistened and cured for three weeks.
[Photo: rc, text: sa]
Once the first coating was cured, another thin coat of concrete was applied. Dry silt was added to this coating while it was wet. [from upper left]Workshop participants Jung Ju Lee and Gabrielle Falconi, workshop participant Alfonso Elia, construction volunteer Darina Trendafilova, Jung Ju Lee and workshop participant Stanford Mandizha.
[Photo: rc, text: sa]
This surface coating blends well with the surrounding structure.
The ceramics shed is complete. Well done!
[Photo: rc, text: sa]
TrackBacks[0]
Comments[0]
Posted by sue on October 30, 2006 3:36:14 PM MST