? This continues the report of a new storage shed for the Ceramics Studio from 9/25/06.
[from upper left] Expanded metal lath was applied to the outer walls, before they were covered with another coat of concrete. Construction staff Brendon Maloney and Mario Nuzzulese prepare a special concrete mix. Angus Gluck [with hat] headed this project.
The coating was moistened and cured for three weeks.
? Once the first coating was cured, another thin coat of concrete was applied. Dry silt was added to this coating while it was wet.
[from upper left]Workshop participants Jung Ju Lee and Gabrielle Falconi, workshop participant Alfonso Elia, construction volunteer Darina Trendafilova, Jung Ju Lee and workshop participant Stanford Mandizha.

? This surface coating blends well with the surrounding structure. The ceramics shed is complete. Well done!





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1162247774792