Today@Arcosanti

nav nav nav nav nav nav nav nav nav
? To continue the report from 3/26/07, concrete for the first part of the ramp has been poured and construction volunteers Darina Trendafilova and Brendan Maloney even the surface with a wooden guide.

? Part of the workshop participants work with crew leader Ron Chandler.
Ron teaches how to achieve the exact mixture of concrete for the surface intended.
The concrete mixture slides down this ramp into a waiting wheel barrow.

? [from upper left] The second section of the ramp is ready for concrete to be poured.
The concrete has been finished to a very smooth surface. Now David and Darina engrave the appearance of pavers that are of the same size as the individual path pavers around the new wall.
March 4. workshop participants work with David Tollas to learn concrete craft.





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1175104934464