We continue our report from 10/24/07, on construction of the new Visitors Center entrance. The Metal Shop crew installed part of a railing on the second level of the new ramp.
From this view, a new set of stairs is at the far end of the photo.
[Photo & text: sa]
We reported on the construction of the stairs on 10/5 and 10/8/07. New railing is installed on both sides of the stairs and a connection to the ramp railing is in process.
[Photo & text: sa]
Metal shop volunteer Darina Trendafilova welds the connecting steel pieces into place. We continue the report on railing installation on 11/7/07.
[Photo & text: sa]