Today@Arcosanti

nav nav nav nav nav nav nav nav nav
? We continue our report from 10/24/07, on construction of the new Visitors Center entrance.
The Metal Shop crew installed part of a railing on the second level of the new ramp.
From this view, a new set of stairs is at the far end of the photo.

? We reported on the construction of the stairs on 10/5 and 10/8/07.
New railing is installed on both sides of the stairs and a connection to the ramp railing is in process.

? Metal shop volunteer Darina Trendafilova welds the connecting steel pieces into place.
We continue the report on railing installation on 11/7/07.





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1193673165121