Today@Arcosanti

nav nav nav nav nav nav nav nav nav
? During the interior finishing work, construction crew installed a hydronic heating system under all of the apartment floors on the second level of the East Crescent.
[see report from 4/19/04]
The hydronic system consists of continuous cross-linked polyethylene tubing secured with metal mesh.
The tubing is protected by a layer of gypcrete. [see report from 4/21/04]. 6,000 linear feet of hydronic tubing was donated by Wyatt Development and the Wirsho/Uponor Company to complete this project.

? The gypcrete floors were tiled in Unit 6, Unit 7 and Unit 9. Unit 8 and Unit 10 floors were carpeted.

? In each room, all of the tubing connects to a wall in-take and out-flow system, which in turn connects to all of the other apartment outlets.
This report continues on 11/14/07 with installation of the distribution system for the hydronic floor heating for all of the second floor and the official opening of same.





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1194899029137