Today@Arcosanti

nav nav nav nav nav nav nav nav nav
? We continue our report from 11/16/07 about new path lighting that will lead all the way from the S.O.D. Office building to the area infront of the Ceramics Apse.
The crew lays conduit for electric wires leading to a new distribution box in front of the Vaults.
[from left] Site electrician Dr. Sparks, workshop participant Nelson DeLaRosa and construction crew Will Holman. Dr. Sparks and Brendan Scott.

? Workshop participants Nelson DeLaRosa and Claudia Giuliana connect parts of the utility line for a sprinkler system that is bedded in the same trench.

? Utility lines are protected with a layer of sand and tape that indicates line location, before the originally removed earth is sifted for rocks and packed back into the trench.
This report continues.





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1195496905965