Today@Arcosanti

nav nav nav nav nav nav nav nav nav
? We continue our report from 11/30/07 of interior construction on the first floor in the back apartment of Unit 10 of the East Crescent.
The walls in the small bathroom were finished with a water-proof drywall sheeting. Sheet edges and fastener heads have been mudded and painted with water-proof coating.
Construction crew leader Melissa Soluski works on one of several layers of the shower pan.

? The shower base is built in three layers. A pre pan of deck-mud, a concrete mortar, is spread on the concrete surface and molded into the shape of the shower pan, with a slight slope towards the shower drain. A CPE vinyl membrane is spread over this layer. The membrane comes up on all three walls and is folder over the step of the pan.
Once this vinyl layer has been tested for any leaks, Melissa installs a layer of wire mesh.

? Another layer of deck-mud is poured, which is reinforced by the wire mesh.
The surface has to cure and we will continue to report on this location when tile installation starts.
The report on general interior work in this apartment continues on 12/7/07.





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1196703014700