Today@Arcosanti

nav nav nav nav nav nav nav nav nav
? We continue our report from 12/17/07.
Local contractor Lane Malouff and crew pour concrete into the form for the first part of concrete curb with an access ramp.

? The crew finishes this long concrete curb.
Cosanti Foundation has received a $50,000 tourism development grant from the Arizona Office of Tourism for work that will include a major upgrade of the Visitors Parking Lot, as well as an ADA pathway leading from the parking lot to the Bakery level entrance, additional night lighting, and a solar photovoltaic system to power the lights.

? This same pour included the first part of the concrete walk-way that connects with the existing visitors path.
The parking lot will be covered with an initial layer of ABC gravel. The final layer of material will be completed with a local rock called Black Canyon Gold.
Report continues on 12/21/07.





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1198082542866