Today@Arcosanti

nav nav nav nav nav nav nav nav nav
? We continue our report from 2/18/08 on construction made possible by a grant of $50,000 from the Arizona Office of Tourism (AOT) awarded to us in October 2007.
The solar panels and control units will be located to the East of Visitor Parking on a concrete slab in the south-east corner of the existing recycling area.

A trench has been dug to bury wiring from the anticipated solar panels to existing utility lines. Shown here are site electricians Dr. Sparks and Brendan Scott [right photo].

? Adjacent to an existing concrete slab, two rectangular trenches have been formed up. They will hold the A-frame anchors.

? The crew erected scaffolding on the concrete slab and lifted the heavy cylindrical swivel girder to the top of the scaffolding.
This report continues on 2/22/08.





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1203528514580