Today@Arcosanti

nav nav nav nav nav nav nav nav nav
? On 7/16/08 and 8/8/08 we posted our last two reports on the new access ramp from the visitors parking lot to the Crafts III Visitors Center. In the interval a lot of hard work was done to completely prepare the six-part ramp for concrete to be poured.
Now, and especially with the recent cement donation [see 8/25 report], the crew is ready and excited to pour the first stage of the ramp, the uppermost portion, part six.

? The crew started mixing concrete at daybreak to take advantage of the cool early morning.
[from upper left] Crew chief Ron Chandler wets the surface of the slope.
The closest the concrete truck could get to the slope was at the south-east corner of the visitors parking lot, quite a distance from the work site.

? A rotating crew with four wheel barrows moved loads of concrete to the second crew, starting the work at the lowest part of slope 6.
Report continues on 8/29/08.





Add a comment

Title
Body
HTML : b, i, blockquote, br, p, pre, a href="", ul, ol, li
Name
E-mail address
Website
Remember me Yes  No 

E-mail addresses are not publicly displayed, so please only leave your e-mail address if you would like to be notified when new comments are added to this blog entry (you can opt-out later).

TrackBack to http://www.arcosanti.org/today/addTrackBack.action?entry=1219880449145