? Today, we report on the interior finish work in East Crescent Unit 9-2.
Alumnus Dan Kelliher and construction crew member Kyle Engoian tiled the floors in the 2-bedroom apartment.
This photo shows one of the bedrooms. The full square tiles have been already set in, and Kyle is removing the spacers used for assuring an even layout.

? In this photo from the second bedroom, Kyle is in the process of setting in the tiles. First, he spreads out a thin layer of thin-set, and then carefully positions each tile.

? The odd-shaped tiles are set in last. In the left-side photo, Kyle is about to set a tile in the threshold. In the right-side photo, he is using the tile-saw machine.