? This continues our report from 7/21/2010 about the construction of a large wall on the east side of the metal shop, where a new water tank will be placed.

The first level of the concrete wall has been poured and here we can see the form for the second level of the wall.

? David Tollas gathered the crew to go through last minute instructions.

? Again, the concrete was mixed at the Arcosanti batch plant and moved to the parking lot above the worksite, from where it was moved down the slope in wheel barrows ….

? …. and shoveled or poured from the wheelbarrows into the form …

? …. and finished.

We continue this report on 7/26/10