This continues our report from 7/21/2010 about the construction of a large wall on the east side of the metal shop, where a new water tank will be placed. The first level of the concrete wall has been poured and here we can see the form for the second level of the wall.
[photo & text: sue]
David Tollas gathered the crew to go through last minute instructions.
[photo & text: sue]
Again, the concrete was mixed at the Arcosanti batch plant and moved to the parking lot above the worksite, from where it was moved down the slope in wheel barrows ….
[photo & text: sue]
…. and shoveled or poured from the wheelbarrows into the form …
[photo & text: sue]
…. and finished.
We continue this report on 7/26/10
[photo & text: sue]
Posted by sue on July 23, 2010 8:14:27 AM MST

