1 CHRISTMAS PARTY
Staff and volunteers gathered for the annual Christmas party this Wednesday evening at 5:30 pm in the Cafe. The party started with a potluck of hours d'oeuvres and a great selection of dessert. The most outstanding dessert was a large gingerbread co...
Dec 15, 2006
2 EAST CRESCENT - LIBRARY
This continues the November 3. 2006 report of the rennovation of the Resident library, which is now located one the first floor of Unit 9 in the East Crescent complex. After intensive cleaning by the construction crew, parts of the ceiling and some...
Dec 4, 2006
3 AUGUST 27. 2006 WORKSHOP - GRADUATION
Congratulations to the August 27. 2006 workshop participants upon their graduation. [from upper left] Jim Keeny continues as a volunteer part-time in Soleri Archives and part-time in guest services, Callie Russell, Mario Nuzzolese continues his int...
Oct 4, 2006
4 EAST CRESCENT - INTERIOR - UNIT 9 LIGHTSCOOP
This continues the report of interior construction of the small bathroom in the Unit 9 Lightscoop apartment on the second floor of the East Crescent Complex. Planning interns Wendy Wu and Natalia Woldarsky start tilework on the showerpan. [Ph...
Sep 20, 2006
5 Template (Left Photo)
Construction is focused on interior work on the second floor of the East Crescent Complex. Tile work proceeds in the bathroom of the two bedroom apartment in Unit 9. [Photo & text: sa] Volunteer Janette Rhee and workshop participant Natal...
May 12, 2006
6 CONSTRUCTION - INTERIOR EAST CRESCENT SECOND FLOOR
Interior work continues in the apartments and dorm-rooms on the second floor of the East Crescent complex. Workshop participants Shaktie Pearce and Nathan Trachimowicz measure and cut drywall. [Photo & text: sa] Drywall seams have been mudded...
Dec 2, 2005
7 CONSTRUCTION - INTERIOR EAST CRESCENT UNIT 6
This continues the report from 11/16. The floor has been tiled in the kitchen and bathroom of the Lightscoop apartment on the second floor of Unit 6, in the East Crescent complex. Tile work continues on shower and bathroom walls. Planning coordinator...
Nov 30, 2005
8 ARCOSANTI PEOPLE JUNE 2005
Arcosanti residents, staff, volunteers and workshop participants on June 24. 2005. [top row from left] Tomiaki Tamura - project director, Ruth-Claire Weintaub - Soleri Book Initiative, Robert Manley - Maintenance, Vanessa Colombel, Aurelien Froment ...
Jun 27, 2005
9 MUSIC CENTER BATHROOM REMODEL 3
This continues the report of the remodel project of bathrooms in the Colly Soleri Music Center on 6/6. [left] In the large shower room the tile design on the floor is coming along and the walls have been prepared for tiles. [right] The toilette and l...
Jun 8, 2005
10 MUSIC CENTER BATHROOM REMODEL 2
This continues the report of the remodel project of bathrooms in the Colly Soleri Music Center posted on 5/23. Segolene Gautier and Kim Chikyung install insulation panels between the new wall studs. [Photo: Yuki Yanagimoto & text: sa] Project ...
Jun 6, 2005
11 EAST CRESCENT - LANDSCAPE WALL
We reported the pour of a concrete wall behind Unit 6 and Unit 7 of the East Crescent complex on 5/02/05. The concrete has set and construction crew members and workshop participants remove the formwork. [Photo: Yuki Yanagimoto & Text: sa] Co...
May 18, 2005
12 NEW BENCHES AT CERAMICS APSE
Construction crew and workshop participants help with the concrete pour of new benches in front of the Ceramics Apse. Concrete is mixed behind the apse.... [Photo: Yuki Yanagimoto & Text: sa] .... and moved in wheel barrows down the grassy slo...
May 16, 2005
13 NEW BENCHES IN FRONT OF CERAMICS APSE
Landscape Department manager Ron Chandler, with the help of workshop participant Nicola Maggiaioli and construction volunteer Mika Kawai, prepares to build a set of three benches in front of the Ceramics Apse. [Photo & Text: sa] The benches w...
May 13, 2005
14 TREE TRIMMING
Many cottonwood trees grow along the Agua Fria Riverbed. Some of the branches have died and hang dangerously over the bunkhouse. The original construction kitchen was located in the east half of this structure. Now it is used as housing for resident...
Mar 28, 2005
15 LANDSCAPE PROJECT POUR
Landscape crew member Krystofer Lanceaux and February workshop participant April Braly shovel sand and gravel into buckets for the concrete mix. [right photo] Construction crew member Joshua Kuensting runs the concrete mixer. [Photo & text: Yuki Y] ...
Mar 14, 2005
16 LANDSCAPE PROJECT PREPARATION
Landscape crew Krystofer Lanceaux, February workshop participant Masahiro Kawabata and Construction volunteer Mika Kawai dig the ground in preparation for widening of the pathway between the foundry apartment and the west housing. [Photo & text: Yuk...
Mar 11, 2005
17 NEW RAILING
The Construction crew installs a new steel railing at the end of East Crescent. The stairs are located on the south wall of Unit 10 and lead up to the roof of the S.O.D unit. [Photo & text: Yuki Y] February workshopper Kelley McLaughlin (left)...
Mar 7, 2005
18 CONSTRUCTION - UTILITIES - SOLAR
Crew-leader Brendan Scott displays a file of maps for all the electric lines in the East Crescent Complex, detailed into public grid connections and solar connections. [Photo & text: sa] Brendan hooks up one of the solar powered light fixtur...
Feb 28, 2005
19 TENT - COLLY SOLERI AMPHITHEATER
One of the recent powerful monsoon storms ripped a large tear into the tent of the Colly Soleri Amphitheater. [Photo & Text: sa] The maintenance crew is on the job. [Photo & Text: sa] The tent was installed in 1989 for the first Minds C...
Aug 18, 2004
20 Woodshop Projects
Corey Frendberg took charge of the woodshop in October, 2003. One of his recent projects is to make new shower grates for the camp bathroom (right). [Photo & Text: aa]
Feb 5, 2004