1 CONSTRUCTION - CERAMICS KILN AREA
This morning, on an unusual cloudy and cool day, the construction crew continued work on the block wall around the Ceramic studio kiln area. Part of the crew mixed concrete on the slab above the kiln area moved the mix by shute to waiting wheel bar...
Jul 11, 2008
2 CERAMICS BELL-CARVING WORKSHOP
Yesterday the Ceramics Apse was adorned by a few fresh faces. A bell-carving workshop, held by Arcosanti Ceramicists Rebecca Manning and Colleen Reckow, brought out seven curious residents - with a waiting list to accommodate more. [Photo:...
Jun 4, 2008
3 CERAMICS STUDIO - SILT BELL CARVING
Revisiting a recent topic, we return to the Ceramics Apse. Finished in 1973, this apse (quarter-of-a-sphere shaped structure) has been home to Arcosanti's ceramic artists ever since. Due to its passive solar architecture features, this workspace i...
Jun 2, 2008
4 CERAMICS STUDIO - SILT PRODUCTION
<!-- First Paragraph seperate multiple paragraphs with --!> More on the ceramic bell casting method at Arcosanti: here, the Silt-Cast bells have been removed from the silt counter, and are drying on the deck of the Ceramics Apse. They must reach a...
May 9, 2008
5 SILT-CASTING AT ARCOSANTI
<!-- First Paragraph seperate multiple paragraphs with --!> Continuing with our report on the Silt-Cast bell technique from Monday, we follow the bells through to their next stage of creation. Here, you see the bells in an early phase. The mois...
May 7, 2008
6 CERAMICS STUDIO - SILT CASTING
As the weather gets warmer, Ceramics Studio staff prepares the silt bed for a pour of silt-cast bells. The silt comes from the Agua Fria river-bed and is pre-moistened and then sifted into a concrete trough. [from left] Ceramics manager Ed Werman...
May 5, 2008
7 CONSTRUCTION - NEW VISITORS CENTER ENTRANCE
To continue the report on construction of the new visitors path around the north side of the Crafts III bulding, this sequence is about the small area leading to the Ceramics Apse. The level of the path has been brought up to the new level of the r...
Mar 21, 2007
8 CONSTRUCTION - EC5 INTERIOR – UNIT 7
Continuation from 1/29/07 report. [from upper left] Planning coordinator Dan Kelliher installs custom built cabinets in the kitchen area of Unit 7 light-scoop studio. A brick-red pigment was used in the concrete counter. The black sink complements...
Jan 31, 2007
9 CONSTRUCTION - NEW VISITORS CENTER ENTRANCE
This continues the report from December 1. 2006, about a series of wall panels that will surround the walk-in refrigerator and recycling area behind the bakery, and upgrade the general entrance to the Arcosanti site. [from upper left] This is one o...
Jan 3, 2007
10 CHRISTMAS PARTY
Staff and volunteers gathered for the annual Christmas party this Wednesday evening at 5:30 pm in the Cafe. The party started with a potluck of hours d'oeuvres and a great selection of dessert. The most outstanding dessert was a large gingerbread co...
Dec 15, 2006
11 HOLIDAY OPEN HOUSE
The Second Annual Arcosanti Holiday Open House took place on Saturday, December 9th! Hundreds attended from neighboring communities. [from upper left] Murray Natkie (AIS member) gives a presentation in the Gallery before taking one of the large ...
Dec 13, 2006
12 CONSTRUCTION - NEW VISITORS CENTER ENTRANCE
This continues the report from November 20. 2006. [from left] Both wall-panel forms are ready. The concrete is mixed on a slab above the Ceramics Apse. Workshop participants Jeffery Meylan, Bernardo Claus and Sayer Broughton pour the concrete m...
Nov 22, 2006
13 CONSTRUCTION - NEW VISITORS CENTER ENTRANCE
This continues the report of November,15. 2006. Construction staff Alfonso Elia, Gabrielle Falconi, Jung Ju Lee and Darina Trendafilova knocked down the wall that divided the Ceramics area from the Visitors path and Crafts III Building. [Ph...
Nov 20, 2006
14 CERAMICS STUDIO - STORAGE SHED
This continues the report of a new storage shed for the Ceramics Studio from 9/25/06. [from upper left] Expanded metal lath was applied to the outer walls, before they were covered with another coat of concrete. Construction staff Brendon Maloney an...
Oct 30, 2006
15 CERAMICS STUDIO - STORAGE SHED
This continues the report from 9/6 of the construction of a storage shed for ceramic bell production. Construction crew leader Angus Gluck has headed this project from the beginning. [Photo: Rafael Carvão & text: sa] Angus installs addition...
Sep 25, 2006
16 CERAMICS STUDIO - STORAGE SHED
This continues the report from 8/21 and 8/23 about construction of a new shed for ceramic bell storage. This shed is located right next to the kiln on the west side of the ceramics apse. The steel roof structure is completed and fire-proof side pan...
Sep 6, 2006
17 CONSTRUCTION - CERAMICS BELL STORAGE
Work continues on the roof for a storage shed for ceramic bells. Construction crewleader Angus Gluck teaches workshop participent Laura Gomez. [Photo & text: sa] The sheet metal for the roof has been custom-cut. [Photo & text: sa] ...
Aug 21, 2006
18 CERAMICS STUDIO - TILES
Individual tiles in several sizes, as well as light-switch covers, are hand-crafted in the Ceramics studio at Arcosanti. Each tile goes through many stages. The clay is rolled out, cut, impressed with individual designs and glazed before firing. ...
Jun 30, 2006
19 WORKSHOP - LAST DAY
The last day of the workshop is action packed. Dorms are cleaned and prepared for the next workshop group, which starts on 6/18. And two more construction projects are poured. One is a sidewalk extension in front of East Housing. [Photo & text...
Jun 16, 2006
20 CONSTRUCTION - CERAMICS BELL STORAGE
Part of the Construction team works on a storage shed for the ceramic bell production. The crew, made up of staff, volunteers and workshop participants, discuss details. [Photo Credit: Daniel Manjarres & text: sa] Crew leader Angus explains ...
Jun 2, 2006